Projects

Completed and ongoing work.

The portfolio includes energy-sector, civil, industrial and substation projects across Bangladesh and beyond.

Featured Project

Teesta 200 MW AC Solar Power Plant

ICR, IDT Foundation Completed
Teesta 200 MW AC Solar Power Plant

ICR, IDT Foundation

Supply TMT bar, Binding Reber, Pouring Concrete, Making stair, Cable Tray Support.

November 2022
Yard Fencing Completed
Teesta 200 MW AC Solar Power Plant

Yard Fencing

Supply Wire mesh, Making pocket gate, Welding work.

December 2022
Module Cleaning System (MCS) Completed
Teesta 200 MW AC Solar Power Plant

Module Cleaning System (MCS)

Laying pipeline, Testing water flow in whole power plant.

October 2023
MCR (Main Control Room) Modification Completed
Teesta 200 MW AC Solar Power Plant

MCR (Main Control Room) Modification

MCR building modified with client's direction.

November 2023
Concrete Supply Helical Pile Capping Completed
Teesta 200 MW AC Solar Power Plant

Concrete Supply Helical Pile Capping

Supply ready mix concrete, and pouring with daily labor.

November 2023
MCR Outer Cable Trench Completed
Teesta 200 MW AC Solar Power Plant

MCR Outer Cable Trench

Supply and installation including all complete as per drawing and design.

December 2022
CTS Foundation Completed
Teesta 200 MW AC Solar Power Plant

CTS Foundation

Supply and installation including all complete as per drawing and design.

December 2022
Reservoir Tank Foundation Completed
Teesta 200 MW AC Solar Power Plant

Reservoir Tank Foundation

Supply and installation including all complete as per drawing and design.

April 2023
Misc. Civil Work Completed
Teesta 200 MW AC Solar Power Plant

Misc. Civil Work

Supply and installation including all complete as per drawing and design.

August 2023
Capacitor Bank and Auxiliary Transformer Foundation Completed
Teesta 200 MW AC Solar Power Plant

Capacitor Bank and Auxiliary Transformer Foundation

Supply and installation including all complete as per drawing and design.

December 2023
Culvert Work Completed
Teesta 200 MW AC Solar Power Plant

Culvert Work

Supply and installation including all complete as per drawing and design.

April 2023
Reservoir Connection Completed
Teesta 200 MW AC Solar Power Plant

Reservoir Connection

Supply and installation including all complete as per drawing and design.

September 2023

Completed

Delivered projects

Bangladesh Water Development Board (BWDB) Subsoil Investigation for Regulator Site at R-5 and R-6 at Rayer Mahal and Khulna City Protection Work, Khulna 2017
Public Works Department Subsoil Investigation for the Building of BNCC Sundarban Regiment office, Khulna 2016
Private Hosiery Company Design and Drawing for Three Industrial Building Sites at Narayanganj 2018
Private Ownership 9 story residential building at Mirpur, Dhaka 2015
Private Ownership 8 story residential building at Bashabo, Dhaka 2015
Private Ownership 7 story residential building at Banasree, Rampura, Dhaka 2018
CRRC, China Ltd Design and construction of 33/11 KV GIS substation at Pagla, Narayongonj 2018
CRRC, China Ltd Design and construction of 33/11 KV GIS substation at Fatulla, Narayongonj 2018
Sungrow Power (Singapore) PTE Ltd Invertor, transformer and GIS box foundation installation 2021
Sungrow Power (Singapore) PTE Ltd 33kv/11kv transmission line 12km 2021
Exelon Bangladesh Ltd Precast pile making, Spectra, Manikganj 2021
Sungrow Power (Singapore) PTE Ltd 6 km herring bone road construction work at Manikganj 2021
Sungrow Power (Singapore) PTE Ltd 2 km RCC internal road construction work at Manikganj 2021
Sungrow Power (Singapore) PTE Ltd 1.5 km slope protection work at Manikganj 2021
Sungrow Power (Singapore) PTE Ltd 2 km internal drainage system with soak well 2021
Rays Power Infra PVT Ltd. 1.5 km cable trench 2022
Rays Power Infra PVT Ltd. 6 nos gantry foundation work along with erection 2022
Rays Power Infra PVT Ltd. Inverter Control Room (ICR) and Inverter Duty Foundation 2022
Rays Power Infra PVT Ltd. Outer cable trench work 2022
Rays Power Infra PVT Ltd. Water reservoir tank making 2023
Rays Power Infra PVT Ltd. Helical pile capping with ready-mix 2023
Rays Power Infra PVT Ltd. Shore piling 2023
Sterling and Wilson PVT Ltd Auxiliary transformer foundation 2024
Sterling and Wilson PVT Ltd Capacitor bank 2024
Sterling and Wilson PVT Ltd Modification civil work for control room 2024
Sterling and Wilson PVT Ltd Internal road making 2024
Sterling and Wilson PVT Ltd Cable trench / tunnel with soak pit 2024
Teesta Solar Limited ICR, IDT Foundation November 2022
Teesta Solar Limited Yard Fencing December 2022
Teesta Solar Limited Module Cleaning System (MCS) October 2023
Teesta Solar Limited MCR (Main Control Room) Modification November 2023
Teesta Solar Limited Concrete Supply Helical Pile Capping November 2023
Teesta Solar Limited MCR Outer Cable Trench December 2022
Teesta Solar Limited CTS Foundation December 2022
Teesta Solar Limited Reservoir Tank Foundation April 2023
Teesta Solar Limited Misc. Civil Work August 2023
Teesta Solar Limited Capacitor Bank and Auxiliary Transformer Foundation December 2023
Teesta Solar Limited Culvert Work April 2023
Teesta Solar Limited Reservoir Connection September 2023

Ongoing

Current projects

HKGE Consortium PVT LTD. Box Transformer Foundation Ongoing
HKGE Consortium PVT LTD. Precast Pile Driving Work Ongoing
HKGE Consortium PVT LTD. Internal road and access road Ongoing
HKGE Consortium PVT LTD. Existing road repair work Ongoing
HKGE Consortium PVT LTD. Main Control Room Ongoing
NORINCO International Module Mounting Structure Work Ongoing
NORINCO International Bi-Facial PV Solar Module Installation Work Ongoing
NORINCO International Earthing System Work Ongoing
NORINCO International Cable Tray Support Work Ongoing
NORINCO International Cable Laying Work Ongoing
Teesta Solar Limited Central Drain Re-Work Ongoing
Teesta Solar Limited Reservoir De-Watering Through Pump Ongoing
Rays Power Infra PVT Ltd. Module Cleaning System Installation and Testing Ongoing
Hunan Construction Engineering Group Corporation Rajshahi WASA Surface Water Treatment Plant, Water Reservoir Work (WTP) Ongoing

Let's Build Something Great Together

Tell us about your project and our team will get back to you.

+88 01972 99 22 77

info@metconbd.com

House #1, Main Road, Block-G, Banasree, Dhaka-1219

www.metconbd.com